Diy Concrete Slab Design

For the DIY concrete slab designer, there are extensive graphics and resources available to build a perfect slab for the kit home builder. It may be that here is a time when the owner builder has to get help, because laying slabs is an arduous, time consuming process best suited to sub-contractors. All handy people have talents, and yours could be concreting, but laying slabs requires a number of talents and skills that must meld for your diy concrete project to be a success. Of course 'properly engineered plans' setting out concrete footing details will be required to legally and soundly build concrete foundation footings.

10 Steps to building a concrete slab

Concrete slab design

1. Excavating site

2. Setting out

3. Digging house footings

4. Rough in plumbing

5. Slab formwork

6. Packing underslab

7. Termite prevention

8. Reinforcing

9. Pouring concrete

10.Concrete finishing

Concrete tools, equipment, supplies

Starting out on this DIY concrete adventure, and it 'will' be an adventure, there is a heap of gear required to build a concrete slab. Most of it will need to be purchased, some hired. Lets make a list...

Concrete slab building tools

• Copy of engineered slab plans
• General carpentry tools
• Theodolite
• Stringlines and timber for set out
• Posts and formwork timber
• Plumbing pipes/joiners/caps
• Crusher dust/road base
• Stamper (manual compactor)
• Vibrating compactor (petrol driven)
• Heavy plastic
• Termite prevention aids
• Steel reinforcing
• Roll of wire ties
• Bar chairs
• Large bolt cutters
• Schroeder tie wire twister
• Short handle square mouth shovels
• Supply of running water
• Short and long screeds
• Selection of hand floats & finishing trowels
• Bull float
• Rubber boots

The first step is to set out your site. This involves setting up profiles and using stringlines to mark the site. For detailed graphic instructions on this process go to our setting out plans page.

Excavation

Mark all footings and plumbing trenches with chalk, then remove the stringlines. Make a boning rod to check depth levels. Set up a theodolite to maintain general levels. A hired rubber tracked mini excavator can be used to dig the concrete slab footings and plumbing rough in plumbing trenches. The excavator will also dig sewerage or septic trenches at the same time. A bobcat will remove excess earth. Most good excavation contractors know their stuff and understand footings, levels, falls and grades and will be an asset to the owner builder due to their experience. Tip: go for the older operator and take their advice. Clean the site of all excess rubble and attach the stringlines to the profiles. Now we are ready for the slab formwork page. Or go straight to our pouring concrete page.

Go to Kit Home Basics home page

Loading

Related pages

Calculating concrete

Footing design

Footing details

Pouring concrete

Setting out plans

Slab formwork

Home base businesses from a kit

Kit home prices

Top 5 ways to build a kit